Leaf Filter 3. 22 x 2 Leaf Filter 3. 875 x 2 Generac Generators 3. 22 x 2 Generac Generators 3. 875 x 2 Bath Concepts 3. 22 x 2 Bath Concepts 3. 875 x 2 Moving Life 3. 22 x 2 Moving Life 3. 875 x 2 Liz Buys Houses 3. 22 x 2 Liz Buys Houses 3. 875 x 2 Heritage for the Blind 3. 22 x 2 Heritage for the Blind 3. 875 x 2 Veteran Car Donations 3. 22 x 2 Veteran Car Donations 3. 875 x 2.
Category: technology
Geoff Keighley’s Summer Game Fest 2026 confirms dates & venue change
MANILA, Philippines – PacificSun Renewables Corp. plans to build a P4.9-billion solar power facility in Ilocos Norte with a capacity of 120.96 megawatts (MW). Based on a document filed at the Department of Environment and Natural Resources (DENR), the proposed project will cover three barangays in Paoay, Ilocos Norte. READ: Philippines emerges as hot spot
「エア」中国で22日販売 米アップル、当局許可か
東大に2学部新設構想 AI・宇宙開発、卓越大認定で
メルカリ、短時間バイト撤退 競争激化で12月に終了
ノーベル経済学賞に米大教授ら3氏 技術革新で経済成長解明
「センチュリー」にクーペ トヨタ、「ジャパンモビリティショー」に試作車
Photo credits: European Union EU governments want to change Horizon Europe eligibility rules to limit the countries that can participate in dual-use and defence projects. The suggestion adds guard rails to the European Commission’s plan to allow dual-use start-ups to receive grant funding and equity.
Photo credits: BigStock An abruptly cancelled €45 million Horizon Europe call for generative AI projects has already been added to the newest draft Horizon Europe work programme for next year. The postponed call, with the reference Horizon-CL4-2025-03-Digital-Emerging.








